Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190002-01 Printed in U.S.A. Form 19XRV-2SS Pg CL-1 11-06 Replaces: 19XRV-1SS
Book 2
Ta b 5a
INITIAL START-UP CHECKLIST
FOR 19XRV HERMETIC CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
DESIGN CONDITIONS:
REFRIGERANT: Type:
Charge
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions . . . . . . . . . . . . . . . . . . Yes
No
2. Machine Assembly, Wiring and Piping Diagrams . . . . . . Yes No
3. Starting Equipment Details and Wiring Diagrams. . . . . . Yes No
4. Applicable Design Data (see above). . . . . . . . . . . . . . . . Yes No
5. Diagrams and Instructions for Special Controls . . . . . . . Yes No
INITIAL MACHINE PRESSURE:
RECORD PRESSURE DROPS: Cooler Condenser
CHARGE REFRIGERANT: Initial Charge Final Charge After Trim
NAME JOB NO.
ADDRESS MODEL
CITY STATE ZIP S/N
TONS
(kW)
BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
COOLER ******
CONDENSER ******
CHILLER LINE SIDE: Volts FLA OLTA
OIL PUMP: Volts RLA OLTA
CARRIER OBLIGATIONS: Assemble... . . . . . . . . . . . . . . . . Yes No
Leak Test . . . . . . . . . . . . . . . . . . . Yes No
Dehydrate . . . . . . . . . . . . . . . . . . Yes No
Charging . . . . . . . . . . . . . . . . . . . Yes No
Operating Instructions Hrs.
YES NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
CHECK OIL LEVEL AND RECORD: ADD OIL: Yes
No
Amount:
1/2 Top sight glass
1/2 Bottom sight glass
3/4
1/4
3/4
1/4
a23-190