EasyManua.ls Logo

Carrier 38AU 16 Series - Start-Up Checklist

Carrier 38AU 16 Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53380054-01 Printed in U.S.A. Form 38AU-16-28-02SI Rev. A Pg CL-1 5-23 Replaces: 38AU-16-28-01SI
START-UP CHECKLIST
(Remove and use for Job File)
I. PRELIMINARY INFORMATION
OUTDOOR: MODEL NO. _______________________________ SERIAL NO. ________________________________________
INDOOR: AIR HANDLER MANUFACTURER __________________________________________________________________
MODEL NO. ________________________________ SERIAL NO. ________________________________________
ADDITIONAL ACCESSORIES ________________________________________________________________________________
II. PRE-START-UP
OUTDOOR UNIT
IS THERE ANY SHIPPING DAMAGE? (Y/N) __________
IF SO, WHERE: ___________________________________________________________________________________________
_________________________________________________________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP? (Y/N) __________
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT? (Y/N) __________
HAS THE GROUND WIRE BEEN CONNECTED? (Y/N) __________
VERIFY GROUND INTEGRITY WITH CONTINUITY TEST? (Y/N) __________
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY? (Y/N) __________
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY? (Y/N) __________
CONTROLS
ARE THERMOSTAT AND INDOOR FAN CONTROL WIRING CONNECTIONS MADE AND CHECKED? (Y/N) __________
(Thermostat wiring must be made directly to the fan coil unit)
ARE ALL WIRING TERMINALS (including main power supply) TIGHT? (Y/N) __________
HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS? (Y/N) __________
INDOOR UNIT
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE? (Y/N) __________
ARE PROPER AIR FILTERS IN PLACE? (Y/N) __________
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT? (Y/N) __________
DO THE FAN BELTS HAVE PROPER TENSION? (Y/N) __________
HAS CORRECT FAN ROTATION BEEN CONFIRMED? (Y/N) __________
PIPING
ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR COILS AS REQUIRED? (Y/N) __________
HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, OUTDOOR AND INDOOR COILS, TXVs
(Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS WITH
A LEAK DETECTOR? (Y/N) __________
LOCATE, REPAIR, AND REPORT ANY LEAKS.
HAVE LIQUID LINE SERVICE VALVES BEEN OPENED? (Y/N) __________
HAVE SUCTION LINE SERVICE VALVES BEEN OPENED? (Y/N) __________
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation, Start-Up, and Service document.

Related product manuals