Carrier 38HD018 - Safety Relief and Electrical Connections; Safety Relief Plug; Power Wiring Instructions

Carrier 38HD018
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table
2
Physical
Data
UNIT
38HD
018
024
030
036
048
060
OPER
WT
(lb),
1
ph/3
ph
148/*
160/*
171/*
240/226
244/235
244/235
REFRIGERANT
I
R-22
COMPRESSOR
Model
Oil
(pts),
initial/recharge
Crankcase
Heater
Watts
Tecumseh
AW5519
32/30
Tecumseh
AW5524
32/30
Hermetic
Carlyle
1
Carlyle
1
J30
|
J36
1
46/44
40
1
Carlyle
|
J48
Copeland
CRP5-0450
70/66
CONDENSER
AIR
FAN
1
Number
Rpm
Diameter
(in.)
no.
blades
Fan
Pitch
Motor
Hp
(NEMA)
Nominal
Cfm
18
3
25
|
27
Vs
1835
|
1720
|
Propeller,
C
1
j
1750
>irect
Drive
850
24
3
24
%
3900
CONDENSER
COIL
Rows
Face
Area
(sq
ft)
Fins/in.
Vh
i
.
61
2
1
15
1
2
|
12.3
!
2
CONNECTIONS
Suction
(in.),
Sweat
Liquid
(in.),
Flare
%
I
i
%
i
%
7
/s
LINE
SIZES
Suction
Liquid
%
i
%
%
|
m
CONTROLS
Pressurestat
Settings
Ui/lh
Cutout
Hlgh
Cut-in
426
±
7
320
±
20
i
«...
Cutout
Low
Cut-in
7
±
5
22
±
5
FUSIBLE
PLUG
210
F
*Not
applicable
should
be
installed
just
after
liquid
line
shutoff
valve.
PROVIDE
SAFETY
RELIEF
A
fusible
plug
is
Do
not
use
a
receiver
(a
receiver
is
not
provided
with
unit
located
in
unit
suction
line.
Do
not
cap
this
plug.
If
local
and
one
should
not
be
used).
code
requires
additional
safety
devices,
install
as
directed.
MAKE
PIPING
SWEAT
CONNECTIONS
Remove
plastic
caps
from
liquid
and
suction
service
valves.
Use
refrigerant
grade
tubing.
Service
valves
are
closed
from
the
factory
and
ready
for
brazing.
After
wrapping
the
service
valve
with
a
wet
cloth,
the
tubing
set
can
be
brazed
to
the
service
valve
using
either
silver
bearing
or
non-silver
bearing
brazing
material.
Consult
local
code
requirements.
Refrigerant
tubing
and
indoor
coil
are
now
ready
for
leak
testing.
NOTE:
Unit
is
shipped
with
R-22
factory
holding
charge
indicated
on
nameplate.
Pass
nitrogen
or
other
inert
gas
through
piping
while
brazing
to
prevent
formation
of
copper
oxide.
A
CAUTION
To
avoid
damage
while
brazing,
service
valves
should
be
wrapped
with
a
heat-sinking
material
such
as
a
wet
cloth.
Step
4
Complete
Electrical
Connections
POWER
WIRING
Unit
is
factory
wired
for
voltage
shown
on
nameplate.
Provide
adequate
fused
disconnect
switch
within
sight
of
unit,
readily
accessible,
but
out
of
reach
of
children.
Provision
for
locking
switch
open
(off)
is
advisable
to
prevent
power
from
being
turned
on
while
unit
is
being
serviced.
Disconnect
switch,
fuses,
and
field
wiring
must
comply
with
National
Electrical
Code
and
local
code
requirements.
Use
copper
wire
only
between
disconnect
switch
and
unit.
Use
minimum
60
C
wire
for
field
power
connection.
Route
power
wires
through
opening
in
unit
side
panel
and
connect
in
unit
control
box
as
shown
on
unit
label
diagram
and
Fig.
6.
Unit
must
be
grounded
5