EasyManua.ls Logo

Carrier 40MBAB - Timer Settings; Setting Timer ON; Setting Timer OFF

Carrier 40MBAB
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40MBAB: Installation Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
7
AIRFLOW DIRECTION FOR DIFFERENT
INSTALLATION LOCATIONS
Fig. 11 — Vertical Airflow
Fig. 12 —Horizontal Airflow
NOTE: Vertical up and horizontal left installation does not need to
change the direction of evaporator.
CONNECTING WIRE AND PIPES
Follow these steps to perform vertical down installation and horizontal
right installation.
1. Open the upper cover.
2. Open the electronic control box cover.
3. Connect the wire according to the wiring diagram.
4. Connect the pipes and install the drainage pipes.
DOWNFLOW AND HORIZONTAL RIGHT
INSTRUCTIONS
NOTE: The unit may be installed in one of the upflow, downflow,
horizontal left or horizontal right orientations.
1. Remove the filter door.
Fig. 13 — Remove the filter door
2. Remove the upper cover assembly.
Fig. 14 — Remove the upper cover assembly
3. Remove the evaporator cover plate.
Fig. 15 —Remove the evaporator cover plate
Upow Downow
Horizontal left
Horizontal right
Remove the
bottom cover rst.
Then remove
the second
cover plate.

Other manuals for Carrier 40MBAB

Related product manuals