START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
SERIAL NO.:
TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
M VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
M CHECK THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
M CHECK THAT RETURN (INDOOR SECTION) AIR FILTERS ARE CLEAN AND IN PLACE
M VERIFY THAT UNIT INSTALLATION IS LEVEL
M CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING AND ORIFICE AND CHECK THAT
SETSCREW IS TIGHT
M CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE L1-L2
L2-L3 L3-L1
CIRCUIT 1 COMPRESSOR AMPS L1 L2 L3
CIRCUIT 2 COMPRESSOR AMPS L1 L2 L3
EVAPORATOR FAN AMPS L1 L2 L3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
DB
RETURN-AIR TEMPERATURE
DB WB
COOLING SUPPLY AIR
PRESSURES
REFRIGERANT SUCTION, CIRCUIT 1
PSIG
REFRIGERANT SUCTION, CIRCUIT 2
PSIG
REFRIGERANT DISCHARGE, CIRCUIT 1
PSIG
REFRIGERANT DISCHARGE, CIRCUIT 2
PSIG
M VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN CORRECT DIRECTION
M VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 31-34.
----------------------------------------------------------------------------------------
CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE
Copyright 1996 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 1b 6b
PC 111 Catalog No. 565-083 Printed in U.S.A. Form 50HJ-15SI Pg CL-1 10-96 Replaces: 50HJ-14SI

Related product manuals