26
C09276
Fig. 34 Defrost Control Board Location
Table 8 – 50TCQ Defrost Board I/O and Jumper Configurations
Inputs
Point Name Type of I/O Connection Pin Number Unit Connection Note
G Fan DI, 24Vac P2-3 LCTB-G
Y1 Cool 1 DI, 24Vac P2-5 LCTB-Y1
Y2 Cool 2 DI, 24Vac P2-4 LCTB-Y2
W1 Heat 1 DI, 24Vac P2-7 LCTB-W1
W2 Heat 2 DI, 24Vac P2-6 LCTB-W2
R Power 24Vac P3-1 CONTL BRD-8
C Common 24Vac P3-2 CONTL BRD-4
DFT1 DI, 24Vac DFT-1 to DFT-1
DFT 2 DI, 24Vac DFT-2 to DFT-2
Outputs
Point Name Type of I/O Connection Pin Number Unit Connection Note
IFO Fan On DO, 24Vac P3-9 REHEAT-2
OF OD Fan On DO, 24Vac OF OFR
RVS1 DO, 24Vac P3-7 to P3-5 Energize in COOL
RVS2 DO, 24Vac P3-6 to P3-4 Energize in COOL
COMP 1 DO, 24Vac P3-10 FPT - REHEAT-6
COMP 2 DO, 24Vac P3-8 REHEAT-8
HEAT 2 DO, 24Vac E-HEAT HC-1 (TB4-1)
COM 24Vac P3-3 HC-1 (TB4-3)
Configuration
Point Name Type of I/O Connection Pin Number Unit Connection Note
Select Jumper 24Vac P1-1
2 Compressor 24Vac P1-3 Use for 50TCQD
SpeedUp Configuration
Point Name Type of I/O Connection Pin Number Unit Connection Note
Speed-Up Jumper JMP17
Speed-Up Jumper JMP18
Jumper for 13 seconds: Factory Test, defrost runs for 9 seconds
Jumper for 520 seconds: Forced Defrost, defrost runs for 30 seconds if DFT2 is open
Reversing valve control The DFB has two outputs for
unit reversing valve control. Operation of the reversing
valves is based on internal logic; this application does not
use an “O” or “B” signal to determine reversing valve
position. Reversing valves are energized during the
cooling stages and the defrost cycle and deenergized
during heating cycles. Once energized at the start of a
cooling stage, the reversing valve will remain energized
until the next heating cycle demand is received. Once
deenergized at the start of a Heating cycle, the reversing
valves will remain deenergized until the next cooling
stage is initiated.
Compressor control — The DFB receives inputs
indicating Stage 1 Cooling, Stage 2 Cooling (sizes 08
14) and Stage 1 Heating from the space thermostat or unit
control system (PremierLink® or RTUOPEN); it
generates commands to start compressors with or without
reversing valve operation to produce Stage 1 Cooling (one
compressor), Stage 2 Cooling (both compressors run) or