83
START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.: SERIAL NO.:
DATE: TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
VERIFY THAT JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
CHECK REFRIGERANT PIPING FOR INDICATIONS OF LEAKS; INVESTIGATE AND REPAIR IF NECESSARY
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
VERIFY THAT UNIT INSTALLATION IS LEVEL
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES
OR SHARP METAL EDGES
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE L1-L2 L2-L3 L3-L1
CIRCUIT 1 COMPRESSOR AMPS L1
L2 L3
CIRCUIT 2 COMPRESSOR AMPS L1
L2 L3
INDOOR-FAN AMPS
OUTDOOR-FAN AMPS NO. 1 NO. 2 NO. 3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE DB WB
RETURN-AIR TEMPERATURE
DB WB
COOLING SUPPLY AIR DB WB
PRESSURES (Cooling Mode)
REFRIGERANT SUCTION, CIRCUIT 1 PSIG F
REFRIGERANT SUCTION, CIRCUIT 2
PSIG F
REFRIGERANT DISCHARGE, CIRCUIT 1 PSIG F
REFRIGERANT DISCHARGE, CIRCUIT 2 PSIG F
VERIFY THAT 3-PHASE FAN MOTOR AND BLOWER ARE ROTATING IN CORRECT DIRECTION.
VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
SET ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO MATCH JOB REQUIREMENTS
(IF EQUIPPED)