EasyManua.ls Logo

Carrier 50ZPM - Start-Up Checklist

Carrier 50ZPM
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
START-UP CHECKLIST
(Remove and Store in Job Files)
I. PRELIMINARY INFORMATION
MODEL NO.: ______________________________________
SERIAL NO.: ______________________________________
DATE: ___________________________________________
TECHNICIAN: _____________________________________
II. PRESTART-UP (Insert check mark in box as each item is completed)
( ) Verify that all packing materials have been removed from unit
( ) Remove all shipping hold down bolts and brackets per installation instructions
( ) Check all electrical connections and terminals for tightness
( ) Check that indoor (evaporator) air filter is clean and in place
( ) Verify that unit installation is level
( ) Check fan wheel, and propeller for location in housing/orifice and setscrew tightness
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE: ______________________________________
COMPRESSOR AMPS: ____________________________________
INDOOR (EVAPORATOR) FAN AMPS: ________________________
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE: __________________________DB
RETURN-AIR TEMPERATURE: ___________________DB ___________________WB
COOLING SUPPLY AIR: ___________________DB ___________________WB
PRESSURES
REFRIGERANT SUCTION:___________________ PSIG, SUCTION LINE TEMP*:___________________
REFRIGERANT DISCHARGE:___________________ PSIG, LIQUID TEMP**:___________________
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
* Measured at suction inlet to compressor
**Measured at liquid line leaving condenser.
Page 27

Related product manuals