CHECKLIST—NON DIRECT VENT (1-PIPE) INSTALLATION
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
VENT PIPING
Termination Location
________ Roof or Sidewall
________ Vent Pipe Length
________ Vent Pipe Elbow Quantity
________ Pipe Diameter Determined from Sizing Table
________ Pipe Sloped To Furnace
Pipe Insulation
________ Over Ceilings
________ Low-Ambient Exposed Pipes
Condensate Drain
________ Unit Level or Pitched Forward
________
Internal Tubing Connections Free of Kinks
and Traps
________
External Drain Connection Leak Tight and
Sloped
________ Condensate Trap Primed before Start-Up
________ Heat Tape Installed if Required
CHECKLIST—START-UP
________
Gas Input Rate (Set Within 2 percent of
Rating Plate)
________ Temperature Rise Adjusted
Thermostat Anticipator
________ Anticipator Setting Adjusted or
________ Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________ Primary Limit
________ Pressure Switch
Copyright 2005 CARRIER Corp. 7310 W. Morris St. Indianapolis, IN 46231 58mtb1si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101 Printed in U.S.A. Catalog No. 58MTB-1SI Pg 60 8-05 Replaces: 58MTA-8SI

Table of Contents

Other manuals for Carrier 58MTB

Related product manuals