CHECKLISTINSTALLATION
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
COMBUSTION AND VENT PIPING
Termination Location
________ Roof or Sidewall
________ Termination Kit 2 Pipe or Concentric
________ Combustion-Air Pipe Length
________ Combustion-Air Pipe Elbow Quantity
________ Vent Pipe Length
________ Vent Pipe Elbow Quantity
________ Pipe Diameter Determined from Sizing Table
________ Pipe Sloped To Furnace
Pipe Insulation
________ Over Ceilings
________ Low-Ambient Exposed Pipes
Condensate Drain
________ Unit Level or Pitched Forward
________
Internal Tubing Connections Free of Kinks
and Traps
________
External Drain Connection Leak Tight and
Sloped
________ Condensate Trap Primed before Start-Up
________ Heat Tape Installed if Required
CHECKLISTSTART-UP
________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
________ Temperature Rise Adjusted
Thermostat Anticipator
________ Anticipator Setting Adjusted or
________ Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________ Primary Limit
________ Pressure Switches