Piping should be pressure and leak tested in accordance with the current
addition of the NFPA 54/ANSI Z223 in the United States, local, and
national plumbing and gas codes before the furnace has been connected.
Refer to current edition of NSCNGPIC in Canada. After all connections
have been made, purge lines and check for leakage at furnace prior to
operating furnace.
PRESSURE TESTING ABOVE ½ psig:
The furnace and it’s individual shut-off valve must be disconnected from
the gas supply piping system during any pressure testing of that system
at test pressures in excess of ½ psig (3.5 kPa).
PRESSURE TESTING BELOW ½ psig:
The furnace must be isolated from the gas supply piping by closing its
individual manual shut-off valve during any pressure testing of the gas
supply piping system at test pressures equal to or less than ½ psig (3.5
kPa).
An accessible manual equipment shutoff valve MUST be installed
external to furnace casing and within 6 ft. (2 M) of furnace.
Install a sediment trap externally in the riser leading to furnace as shown
in Fig. 32. Connect a capped nipple into lower end of tee. Capped nipple
should extend below level of furnace gas controls. Place a ground joint
union between furnace gas control valve and exterior manual equipment
gas shutoff valve.
A11035
Fig. 32 – Typical Gas Pipe Arrangement
A 1/8-in. (3 mm) NPT plugged tapping, accessible for test gauge
connection, MUST be installed immediately upstream of gas supply
connection to furnace and downstream of manual equipment shutoff
valve.
Piping should be pressure and leak tested in accordance with the current
addition of the NFPA 54/ANSI Z223 in the United States, local, and
national plumbing and gas codes before the furnace has been connected.
Refer to current edition of NSCNGPIC in Canada. After all connections
have been made, purge lines and check for leakage at furnace prior to
operating furnace.
NOTE: The furnace gas control valve inlet pressure tap connection is
suitable to use as test gauge connection providing test pressure DOES
NOT exceed maximum 0.5 psig (14-in. w.c.) stated on gas control valve.
See Fig. 64.
If pressure exceeds 0.5 psig (14-in. w.c.), gas supply pipe must be
disconnected from furnace and capped before and during supply pipe
pressure test. If test pressure is equal to or less than 0.5 psig (14-in. w.c.),
turn off electric shutoff switch located on furnace gas control valve and
accessible manual equipment shutoff valve before and during supply
pipe pressure test. After all connections have been made, purge lines and
check for leakage at furnace prior to operating furnace.
Gas Pipe Grommet
For direct vent (2-pipe) applications, the opening for the gas pipe must
be sealed to prevent air leakage. Remove the knockout or plug, install
the grommet in the hole, then insert the gas pipe. The grommet is
included in the loose parts bag. See Fig. 30.
ELECTRICAL CONNECTIONS
See Fig. 33 for field wiring diagram showing typical field 115-V wiring.
Check all factory and field electrical connections for tightness.
Field-supplied wiring shall conform with the limitations of 63°F (33_C)
rise.
WARNING
!
FIRE OR EXPLOSION HAZARD
A failure to follow this warning could result in personal injury, death,
and/or property damage.
If local codes allow the use of a flexible gas appliance connector,
always use a new listed connector. Do not use a connector which has
previously served another gas appliance. Black iron pipe shall be
installed at the furnace gas control valve and extend a minimum of 2-in.
(51 mm) outside the furnace.
GAS
SUPPLY
MANUAL
SHUT OFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
NOTE: Union may be inside the
vestibule where permitted by
local codes.
FRONT
WARNING
!
ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD
Failure to follow safety warnings could result in dangerous operation,
serious injury, death or property damage.
Improper servicing could result in dangerous operation, serious injury,
death or property damage.
- Before servicing, disconnect all electrical power to furnace.
- When servicing controls, label all wires prior to disconnection.
Reconnect wires correctly.
- Verify proper operation after servicing.
- Always reinstall access doors after completing service and
maintenance.
WARNING
!
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Blower door switch opens 115-V power to control. No component
operation can occur. Do not bypass or close switch with blower door