CL-3
START-UP CHECKLIST — 39MW OUTDOOR AHU UNITS
Once start-up is complete, send a completed copy of this checklist to the applicable
Sales Engineer and Post Sale Product Marketing at 39MW@carrier.utc.com
I. PRELIMINARY INFORMATION
MODEL NO.JOB NAME ________________________
SERIAL NO. ADDRESS ________________________
START-UP DATE _____________________________
TECHNICIAN NAME ___________________________
ADDITIONAL ACCESSORIES
___________________________
__________________________________________________________________________
II. PRE-START-UP
SINGLE POINT POWER OPTION
Are power connections to the Single Point Power Enclosure made and checked? (Y/N) _____
Are all power harness connections made at unit splits? (Y/N) _____
Are all wiring terminals tight? (Y/N) _____
CONTROLS
Are control(s) and indoor fan control wiring connections made and checked?
(Y/N) _____
Ar
e all wiring terminals tight? (including power to fan motors, heaters, etc.) (Pg 141) (Y/N) _____
AIR HANDLER
Remove packaging and any construction debris. (Y/N) _____
Inspect for shipping and/or handling damage, make claims as required. (Pg 84) (Y/N) _____
Inspect all panel flanges for damage. Panel flanges should be smooth with no sharp bends. (Y/N) _____
Are all corner connectors and frame
to channel joints smooth with no cracks, large bumps
or depressions in the caulk? (Y/
N) _____
Are any door latches loose or damaged? If so, tighten or replace (Y/N) _____
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instruction document.
AT EACH SECTION JOINT, VERIFY: JOINT 1 JOINT 2 JOINT 3 JOINT 4 JOINT 5 JOINT 6
IS ROOF SLIDER INSTALLED ON TOP OF
ROOF?
(PG 90) (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
IS END ROOF BRACKET MOUNTED AND
GASKETED TO EACH SIDE OF ROOF
JOINT?
(PG 86) (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
ARE BASE RAILS BOLTED ON BOTH
SIDES?
(PG 86-87) (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
A
RE UPPER SIDE TOP BRACKETS
UNDER ROOF BOLTED AND
TIGHTENED?
(PG 90) (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
ARE BOTH SECTION TO SECTION
JOINTS UNIFORMLY GASKETED?
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
IS GASKET COMPRESSED AND A
SECTION-TO-SECTION SPLIT CAULKED
ALONG ENTIRE LENGTH OF SEAM?
(PG 86) (Y/N) _____ (Y/N) _____ (Y/N) _____
(Y/N) _____ (Y/N) _____ (Y/N) _____
IF CCH ATTACHED, VERIFY CCH TO UNIT
SEALS:
CCH 1 CCH 2 CCH 3
IS ROOF BRACKET SLIDER INSTALLED
ON TOP OF ROOF?
(PG 117) (Y/N) _____ (Y/N) _____ (Y/N) _____
ARE SIDE FLASHINGS INSTALLED ON
BOTH SIDES?
(PG 116) (Y/N) _____ (Y/N) _____ (Y/N) _____
IS CCH TO UNIT BASE JOINT CAULKED
PER INSTRUCTIONS?
(PG 117) (Y/N) _____ (Y/N) _____ (Y/N) _____