EasyManua.ls Logo

Carrier BWMAAN000050 - Page 21

Carrier BWMAAN000050
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-6
Combustion Air
Roof boot/ ashing
( eld supplied)
Support
( eld supplied)
Combustion Air
Vent
Note: Support must
be eld installed to
secure termination
kit to structure
Vent
Maintain 12"(30cm)
clearance above highest
anticipated snow level
24" above roof
Concentric
Vent Roof
Terminations
Glue inner vent pipe to prevent
recirculation.
Maintain 12" (30 cm) minimum
clearance above highest anticipated
snow level. Maximum of 24"(0.61m)
above roof.
Support must be eld installed to
secure termination kit to structure.
Elbow, roof boot/ ashing eld
supplied.
Allowed Wall/Roof thickness 1/2"-30"
(1.2 - 76cm).
Vertical concentric vent system can be
installed in unused masonry chimney.
Contact Technical Support for
questions regarding installation or use.

Related product manuals