EasyManua.ls Logo

Carrier BWMAAN000050 - Condensate Piping

Carrier BWMAAN000050
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
6 - COMBUSTION AIR AND VENT PIPING
6.6 Condensate Piping
Use materials acceptable to authority having jurisdiction.
In absence of such authority:
PVC or CPVC per ASTM D1785/D2845 Cement or
primer per ASME D2564 or F493.
Attach PVC tee provided with boiler and eld sourced
piping to condensate drain at bottom of boiler. See
gure 6-1.
Slope condensate drain pipe minimum 1/4" per foot
(21mm/m) away from boiler.
• Use eld source condensate pump if boiler located
below disposal point.
Field source condensate neutralizing kit as required
by authority having jurisdiction or for environmentally
friendly condensate disposal.
FIGURE 6-1 Condensate Drain
Condensate Tee
( eld installed)
on condensate drain
pipe

Related product manuals