EasyManua.ls Logo

Carrier XCT7 40VU0051-7E-QEE - Page 20

Carrier XCT7 40VU0051-7E-QEE
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Procedures
Lifting Drainpipe
The drainpipe can be lifted 450mm.
When the down gradient of the drainpipe can't be ensured,
after upright lifting, the drainpipe is in the down slope.
Conrming Drainage
The drainage should be conrmed during the test run to make sure that there is leakage at the connection.
The conrmation of drainage should be also performed during the installation in the winter season.
After mounting the electrical system, do cooling operation and meanwhile add water and check.Fill 600cc water with a
hose from the injection nozzle. Add the water slowly. Don't add water to the motor of the drainage pump.
100mm
below
lifting
450mm below
lifting 600mm below
under the ceiling
Conrm the sound of the motor:
Conrm the sound of the motor of the drainage pump and meanwhile check the drainage.
Heat Insulating Treatment:
Wrap the connection between the clamp and the
root segment of the indoor unit without any gap
with heat insulating materials as shown in the
drawing.
drain connection
injection nozzle
Tubing Permissible Length & Height Di󰀨erence
Please refer to the attached manual of outdoor units.
Tubing Materials & Specications
Please refer to the attached manual of outdoor units.
Model AB052~092MAERA AB122MAERA
Tubing Size (mm)
Gas pipe Ø9.52 Ø12.7
Liquid pipe Ø6.35 Ø6.35
Tubing Material Phosphor deoxybronze seamless pipe (TP2) for air conditioner
Hose
Hose clamp
PVC pipe
Rigid PVC adhesive
Water outlet
12
English

Related product manuals