EasyManua.ls Logo

Checkpoint 1250E Series - Pump Data; Pump Installation

Checkpoint 1250E Series
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1250E & 1500E Electric Pump
Operating Manual
CP/MAN-PRD-1215E REV. 02 EFF. DATE: 12/15/12 Page 3 of 13
CAUTION: DO NOT OPERATE PUMP WITHOUT READING ALL OF THE FOLLOWING
INFORMATION!
This manual covers the installation and operation of CheckPoint Electric motor-driven pumps fitted with Series
1250/1500 chemical heads and CheckPoint stroke-adjustable type E gearboxes.
1. PUMP DATA
1.1. All information specific to the pump unit shipped with these instructions is contained in the PUMP
DATASHEET attached to this Manual.
1.2. Refer to Figure 5 on the last page of this Manual for location of referred components of this pump.
2. PUMP INSTALLATION
2.1. Prior to installing your injector, please inspect the pump carefully for any possible in-transit
damage. If the pump appears damaged, call your authorized CheckPoint distributor or call
CheckPoint customer service directly at (800) 847-7867 or (504) 340-0770 to confirm damaged
condition. If we determine that damage has occurred in transit, you will need to file a claim with the
carrier.
FIGURE 1
2.2. Ensure that all necessary components are present in your injection system and in good working
order. CheckPoint is available to answer your process questions or to help design and build a skid
system utilizing components appropriate for your application.
CAUTION: THE PUMP MUST ALWAYS BE ORIENTED WITH THE SUCTION CHECK VALVE
FACING DIRECTLY DOWN. MOUNTING THE PUMP IN ANOTHER ORIENTATION
MAY CAUSE CHEMICAL LEAKAGE TO COLLECT IN AN UNDESIRED LOCATION
OR CAUSE OTHER PROBLEMS.

Related product manuals