EasyManua.ls Logo

Chery T19 2020 - Page 9

Chery T19 2020
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
01 - HOW TO USE THIS MANUAL
01–5
[4]: Repair Instructions
Briefly explain repair items in the form of text.
[5]: Part No.
[6]: Additional Station
Ex is the abbreviation of Exclude.
Additional station indicates the repair station needs to be performed before proceeding to the next repair station.
When calculating labout time, add the labour time of additional station.
Abbreviations
[7]: Labour Time Standard
Labour time standard: The time to a series of activities (including vehicle reception, malfunctions judgment,
parts procurement, servicing & operating, vehicle delivery, etc.) is included.
For labour time, every 100 units is one hour.
Calculation of labour time:
w/o Additional Station
As shown in the illustration, the labour time is 20 if there is no additional station.
w/ Additional Station
As shown in the illustration, if there is additional station, calculation of labour time is 10 + 120 =130.
Abbreviations Meaning Abbreviations Meaning
A/C Air Conditioning LWR Lower
ABS Anti-Lock Brake System MD Middle
ASSY Assembly MT Manual Transmission
BCM Body Control Module OTR Outer
CD Compact Disc PCV Positive Crankcase Ventilation
CVT Continuously Variable Transmission RH Right
FR Front RR Rear
HVAC
Heating, Ventilation and Air
Conditioning
SD Side
INR Inner UPR Upper
LH Left W/ With
W/O Without
NOTE
When calculating working hours, only repairing time of the primary operations would be given directly. In case
of both primary and secondary operations are co-existed, the working hours are calculated by adding the time
amount for secondary operations to that for primary operations.