EasyManua.ls Logo

Chuango DML-100 - Mounting Procedures; Adhesive Tape Mounting; Screw Mounting Procedure

Chuango DML-100
7 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mount the Sensor
Use the 3M Double-side Adhesive Tape
Remove the adhesive tape lm, and stick one side on the back of the magnetic base, the
other side on the wall.
Snap the sensor on the base.
Magnet base
Charging port
Light
Loudspeaker
Magnet base
Charging port
Light
Loudspeaker
Magnet base
Charging port
Light
Loudspeaker
Use the Provided Screws
Place the base against the wall and use a pencil to mark the desired location for mounting.
Drill holes at each marking. Insert anchors into the holes if needed, and x the base onto
the wall with the provided screws.
Snap the sensor back onto the base.
Magnet base
Charging port
Light
Loudspeaker