EasyManua.ls Logo

CIAT AQUACIATPOWER LD 602R User Manual

CIAT AQUACIATPOWER LD 602R
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Instruction manual
LD 602R - 3500R
ILD 602R - 4000R
AQUACIAT
POWERâ„¢
07 - 2023
10590

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the CIAT AQUACIATPOWER LD 602R and is the answer not in the manual?

CIAT AQUACIATPOWER LD 602R Specifications

General IconGeneral
BrandCIAT
ModelAQUACIATPOWER LD 602R
CategoryChiller
LanguageEnglish

Summary

Handling and Positioning

Handling Procedures

Guidelines for safely moving and lifting the unit using specialized equipment or trained personnel.

Unit Positioning Guidelines

Recommendations for selecting an appropriate installation site, considering access, levelness, and environmental factors.

Dimensions, Clearances, and Installation Distances

Free Spaces and Flammable Zones

Details required clearances for maintenance and operation, and identifies potentially flammable zones around the unit.

Physical and Electrical Data

Electrical Connection

Power Supply Requirements

Details power supply specifications, voltage ranges, and connection requirements for the unit.

Power Connection and Disconnect Switch

Describes the single point of connection and the location of the unit's disconnect switch.

Recommended Cable Sections

Provides guidelines for selecting appropriate cable sections based on unit capacity and voltage drop.

Application Data

Operating Range

Defines the operational limits for water and air temperatures for LD and ILD units.

Water Connections

Operating Precautions and Recommendations

Essential checks and recommendations for water circuit connections and preparation before start-up.

Hydraulic Connections

Diagrams and explanations of typical hydraulic circuits for units with and without hydraulic modules.

Hydraulic Connections for ILD 2300R-4000R Units

Specific hydraulic connection diagrams for ILD 2300R-4000R units, including module communication.

Nominal System Water Flow Rate Control

System Start-Up

Checks Before System Start-Up

Comprehensive checklist of pre-start-up checks for the thermodynamic system and installation.

Commissioning Procedures

Steps and precautions to be taken during unit commissioning, supervised by a qualified technician.

Essential Points to Check

Key checks for compressors, hydraulics, and refrigerant charge before initial operation.

Main Components and Operating Characteristics

Options

Free Cooling Options

Explains Free Cooling operation, advantages, and corrosion protection requirements.

Standard Maintenance

Level 1 Maintenance Procedures

Simple, user-doable maintenance tasks including visual checks and cleaning.

Level 2 Maintenance Procedures

More complex tasks requiring specific expertise, including electrical and hydraulic system checks.

Level 3 Maintenance Procedures

Advanced maintenance requiring specialized skills, tools, and manufacturer authorization.

Unit Start-Up Checklist for Installers

Unit Start-Up Procedures

Detailed steps for initiating unit start-up, including voltage checks and water loop verification.

QUICK TEST Function and Setpoint Configuration

Instructions for performing the QUICK TEST function and re-entering system setpoints.

Recording Temperatures and Pressures

Guidance on recording key operational temperatures and pressures after the unit has stabilized.

Related product manuals