vi Cisco 7010 Hardware Installation and Maintenence
Fan Shutdown 1-45
Chapter 2 Preparing for Installation 2-1
Safety Recommendations 2-2
Lifting Safely 2-2
Working with Electricity 2-2
Preventing Electrostatic Discharge Damage 2-3
Site Requirements 2-4
AC and DC Power 2-4
Plant Wiring 2-4
Interference Considerations 2-5
Distance Limitations 2-5
HSSI Connections 2-13
Equipment Racks 2-13
Site Environment 2-15
Preventive Site Configuration: Maintaining Normal Operation 2-16
General Precautions 2-17
Equipment-Rack Ventilation 2-17
Power 2-18
Preparing Network Connections 2-18
Additional and Optional Connection Equipment 2-18
ATM Connection Equipment 2-19
Channel Attachment Connection Equipment 2-23
Ethernet Connection Equipment 2-23
Fast Ethernet Connection Equipment 2-27
Token Ring Connection Equipment 2-28
Token Ring Cables and Connectors 2-29
Token Ring Physical Connections 2-29
Token Ring Fault Management 2-31
FDDI Connection Equipment 2-32
FDDI Media 2-32
FDDI Transceivers and Cable Connectors 2-33
FDDI Physical Connections 2-33
FDDI Fault Management 2-34
MultiChannel (MIP) Connection Equipment 2-36
Serial Connection Equipment 2-37
Universal Serial Cables 2-38
E1-G.703/G.704 Cables 2-39
NRZ and NRZI Formats 2-39
Cyclic Redundancy Checks (CRCs) 2-40
Signal Modes and Timing 2-40
EIA/TIA-232 Connections 2-41
EIA/TIA-449 Connections 2-41
V.35 Connections 2-42
X.21 Connections 2-42
EIA-530 Connections 2-43
M3 Metric Thumbscrew Replacements 2-43
HSSI Connection Equipment 2-43
Console and Auxiliary Port Connection Equipment 2-44