Installing the Cisco MDS 9148V-K9 Switch
This chapter describes how to install a Cisco MDS 9148V-K9 switch and its components.
Before you install, operate, or service the system, see the Regulatory Compliance and Safety Information for
the Cisco MDS 9000 Family document for important safety information.
This unit is intended for installation in restricted access areas. A restricted access area can be accessed
only through the use of a special tool, lock and key, or other means of security. Statement 1017
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Warning
Preinstallation, on page 1
Installing the Switch, on page 6
Grounding the Switch, on page 12
Installing and Removing Components, on page 13
Preinstallation
Cisco MDS 9000 Series Telco and EIA Shelf Bracket
The optional Telco and EIA Shelf Bracket Kit (part number DS-SHELF=) can temporarily or permanently
support the switch during installation. After the front rack-mount brackets are securely attached to the
rack-mounting rails, the shelf bracket can be removed.
The Telco and EIA Shelf Bracket kit supports the following configurations:
A two-post Telco rack
A four-post EIA rack
Installing the Cisco MDS 9148V-K9 Switch
1
Question and Answer IconNeed help?

Do you have a question about the Cisco 9000 Series and is the answer not in the manual?

Cisco 9000 Series Specifications

General IconGeneral
ModelCisco 9000 Series
LatencySub-microsecond
Ports1/10/25/40/100 GE
Power SupplyRedundant
LayerLayer 2 and Layer 3
Security FeaturesACLs, TrustSec, MACsec
ModularityModular and fixed configurations available
ManagementCisco DNA Center, CLI, SNMP
RedundancyPower supplies

Summary

Preinstallation

Cisco MDS 9000 Series Telco and EIA Shelf Bracket

Optional kit for supporting the switch during installation in racks.

Shelf-Installation Guidelines

Procedures for installing a switch using the Telco and EIA Shelf Bracket Kit.

Before Installing the Shelf Brackets

Inspect kit contents and prepare for shelf bracket installation.

Required Equipment

Tools and items needed for shelf bracket installation.

Installing the Shelf Bracket Kit into a Four-Post EIA Rack

Step-by-step guide for installing the shelf bracket kit in a four-post EIA rack.

Preinstallation Guidelines

Airflow Considerations

Managing airflow direction for switch cooling and component compatibility.

Connection Guidelines for AC-Powered Systems

Recommendations for connecting the switch to AC power sources for safety and redundancy.

Installation Guidelines

General rules for site preparation, space, grounding, and power for switch installation.

Unpacking and Inspecting the Switch

Inspect Shipment Contents

Verify all ordered items are present after receiving the shipment.

Checking for Damage

Procedures for reporting any damage or discrepancies found during shipment inspection.

Installing the Switch

Installing the Switch in a 4-Post Rack

Detailed steps for mounting the Cisco MDS switch into a four-post rack.

Installing the Switch into a 2-Post Rack

Detailed steps for mounting the Cisco MDS switch into a two-post rack.

Grounding the Switch

Grounding Procedure

Steps to properly ground the switch chassis using a grounding cable and lug.

Installing and Removing Components

Installing the ESD Grounding Strap

How to properly wear an ESD wrist strap to prevent static discharge damage.

Installing and Removing Power Supply Units

Installing Power Supply Units

Instructions for installing a new power supply unit (PSU) into the switch.

Removing Power Supply Units

Instructions for safely removing a power supply unit (PSU) from the switch.

Installing and Removing Fan Modules

Installing a Fan Module

Steps to install a new fan module into the switch chassis.

Removing a Fan Module

Steps to safely remove an existing fan module from the switch.