Do you have a question about the Cisco 9000 Series and is the answer not in the manual?
Model | Cisco 9000 Series |
---|---|
Latency | Sub-microsecond |
Ports | 1/10/25/40/100 GE |
Power Supply | Redundant |
Layer | Layer 2 and Layer 3 |
Security Features | ACLs, TrustSec, MACsec |
Modularity | Modular and fixed configurations available |
Management | Cisco DNA Center, CLI, SNMP |
Redundancy | Power supplies |
Optional kit for supporting the switch during installation in racks.
Procedures for installing a switch using the Telco and EIA Shelf Bracket Kit.
Inspect kit contents and prepare for shelf bracket installation.
Tools and items needed for shelf bracket installation.
Step-by-step guide for installing the shelf bracket kit in a four-post EIA rack.
Managing airflow direction for switch cooling and component compatibility.
Recommendations for connecting the switch to AC power sources for safety and redundancy.
General rules for site preparation, space, grounding, and power for switch installation.
Verify all ordered items are present after receiving the shipment.
Procedures for reporting any damage or discrepancies found during shipment inspection.
Detailed steps for mounting the Cisco MDS switch into a four-post rack.
Detailed steps for mounting the Cisco MDS switch into a two-post rack.
Steps to properly ground the switch chassis using a grounding cable and lug.
How to properly wear an ESD wrist strap to prevent static discharge damage.
Instructions for installing a new power supply unit (PSU) into the switch.
Instructions for safely removing a power supply unit (PSU) from the switch.
Steps to install a new fan module into the switch chassis.
Steps to safely remove an existing fan module from the switch.