EasyManua.ls Logo

Cisco CISCO7201 - Page 58

Cisco CISCO7201
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-28
Cisco 7201 Installation and Configuration Guide
OL-11364-04
Chapter 2 Installing the Cisco 7201 Router
Connecting Power
Figure 2-24 Stripping the DC-Input Power Ground Wire
Step 3 If your ground wire is insulated, use a wire stripping tool to strip the 18-gauge wire, (or 16-gauge, but
not smaller than the supply conductor) ground wire to 0.5 inch (12.7 mm)
+ 0.02 inch (0.5 mm) as shown
in
Figure 2-24.
Step 4 Slide the open end of the ground lug over the exposed area of the 18-gauge wire.
Step 5 Use a crimping tool to crimp each ground wire to a ground lug.
Figure 2-25 Placing the Ground Lugs, Star Washers, and Nut
Step 6 Place the ground lugs, star washers, and nut on the grounding stud in this order:
a. Star washer
b. Ground lug
c. Star washer
d. Ground lug
e. Nut
Step 7 Tighten the nut to complete the installation.
1 0.5 inch (12.7 mm) + 0.02 inch (0.5 mm)
57019
1
PWR
SLOT 2
B
A
170970

Table of Contents

Related product manuals