Step 7
Place the logo bezel (see the figure below) over the bezel support, and press firmly until the bezel snaps onto the ball
stud snaps on the front (SFC) side of the chassis.
Figure 6: Attaching the Front (SFC) Side Upper Grille and Logo Bezel
—
Fixed Configuration Power Shown
Cisco CRS Carrier Routing System Fabric Card Chassis Installation Guide
9
Installing and Removing Exterior Cosmetic Components
Steps