Citrix ADC MPX
Note
Make sure that a power outlet is available for each cable.
If the kit that you received does not fit your rack, contact your Citrix sales representative to order
the appropriate kit.
Transceiver modules are sold separately. Contact your Citrix sales representative to order
transceiver modules for your appliance. Only transceivers supplied by Citrix are supported on
the appliance.
Important
For Brazilian customers, Citrix does not ship a power cable. Use a cable that conforms to the
ABNT NBR 14136:2002 standard.
In addition to the items included in the box with your new appliance, you need the following items to
complete the installation and initial configuration process.
• Ethernet cables for each additional Ethernet port that you connect to your network.
• One available Ethernet port on your network switch or hub for each Citrix ADC Ethernet port you
want to connect to your network.
• A computer to serve as a management workstation.
Prepare the site and rack
There are specific site and rack requirements for the Citrix ADC appliance. Make sure that adequate
environmental control and power density are available. Racks must be bolted to the ground, have
suicient airflow, and have adequate power and network connections. Preparing the site and rack
are important steps in the installation process and help ensure a smooth installation.
Site requirements
The appliance must be installed in a server room or server cabinet with the following features:
• Environment control
An air conditioner, preferably a dedicated computer room air conditioner
(CRAC), capable of maintaining the cabinet or server room at a temperature
of no more than 27 degrees C/80.6 degrees F at altitudes of up to 2100
m/7000 ft, or 18 degrees C/64.4 degrees F at higher altitudes, a
humidity level no greater than 45 percent, and a dust-free environment.
• Power density
Wiring capable of handling at least 4000 watts per rack unit in addition
to power needs for the CRAC.
© 1999–2023 Cloud Soware Group, Inc. All rights reserved. 134