3
.Overview
Instruments and controls
(1) RFID reader.
(2) Lighting/Direction indicator control stalk.
(3) Horn.
(4) Starting switch.
(5) Wiper/Screenwash/Pedestrian horn.
(6) Instrument panel.
(7) Vents.
(8) Central storage compartment.
(9) USB socket.
(10) Central control panel: assistance call/
central locking/hazard warning lamps/air
conditioning/automatic air recirculation.
(11) Side control panel: foglamps/City power
steering function/headlamp beam height
adjustment.
(12) Heating system.
(13) 12 V accessory socket.
(14) Driving mode selector.
Presentation of your
E-MEHARI
An elegant design
combined with the latest
technology
Your E-MEHARI is an innovative electric
vehicle with a
new approach to mobility. Some
of the vehicle's systems operate differently from
those on a conventional internal combustion
engine vehicle.
Your E-MEHARI uses energy stored in an
LMP
®
(Lithium Metal Polymer) battery. The
LMP
®
battery has to be charged before you
can drive your E-MEHARI. The LMP
®
battery
progressively discharges during use of the
vehicle.
If the state of charge of the LMP
®
battery is at
0%, your E-MEHARI cannot be started: the
LMP
®
battery must be charged.
A full recharge (from 0% to 100%) on a
normal
domestic power supply (standard charge) takes
between 8 and 13 hours on average depending
on the electrical system you have installed.
Your E-MEHARI uses two different types of
battery: the LMP
®
battery to drive the vehicle
and a 12 V battery, as on a conventional
vehicle with an internal combustion engine.
The 12 V battery provides the energy needed
for operation of the vehicle's systems: e.g. the
audio system, the exterior and interior lighting,
the windscreen wipers.
https://www.automotive-manuals.net/