EasyManua.ls Logo

Clark C300 40 - Operating Hints (Monitoring and Maintenance); Monitoring Operating Characteristics and Reporting; Maintenance and Repair Personnel Qualifications; Reserve Fuel Supply Operation

Clark C300 40
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before
Operation
14977
30.
Push
tilt
lever
forward
and
hold
in
position
until
upright
tilts
forward
to
near
vertical
position.
Return
tilt
lever
to
neutral
position
to
halt forward
tilting
action
at
desired
point.
14971
31.
Carefully
check
for
adequate
unobstructed
overhead
clearance,
then
gently
pull
back
on
lift
con-
trol
lever
and
hold
until
up-
right
reaches
maximum
lift
height.
Return
lift
lever
to its
neu-
tral
position
to
halt
lift
at
desired
level.
Note
any
erratic upright
operation
on
your check
list.
Code:
OI-345
Jul
74
14972
32.
Gently push forward
on
lift
control
lever
and
closely
observe
descent
of
upright.
Return
lift
control
lever
to
its
neutral position
to
stop
upright
descent
near
(about
4-6
inches)
floor
level.
Record
any
erratic
or un-
usual
operation
on
your
check
list.
Page
25

Related product manuals