EasyManua.ls Logo

Clearlight RED LIGHT THERAPY - Assembly Instructions; Adding the CORE Tower to your Sauna; Attaching Light Therapy Tower

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Assembly Instructions
Clearlight Red Light Therapy | The CORE Tower can be used without a stand. It can be conveniently
mounted inside any of our Clearlight saunas or you can place it against a wall or even on its side for
flexible usage options.
A. Adding the CORE Tower to your Sauna
Our exclusive CORE Tower is specifically designed to take your Clearlight Sauna experience to new
heights of rejuvenation. Craed to withstand sauna heat, the CORE seamlessly aaches to your
Clearlight Sauna door, combining Red Light Therapy with Infrared Sauna sessions for unmatched
benefits.
1a. Remove existing metal bolts from the sauna door. Keep them for potential future options.
(Make sure that door hinges are fully tightened, as they can loosen over time due to use.)
2a. Insert black plastic washers over exterior and interior door mounts.
3a. Insert male door mount through top glass hole, align with female door mount.
4a. Insert and snugly tighten screw on the inside door mount.
5a. Repeat for the second hole. Place name plate on exterior mount.
B. Aaching Light Therapy Tower:
1b. Stabilize the sauna door.
2b. Align fixture with mounting pins using glass reflection.
3b. Slide fixture down over pins until engaged in back plate.
7
x2
x2
1a 3b1b 2b2a 3a 4a
Install Sauna door mounts: Aaching Light Therapy Tower: