EasyManua.ls Logo

Clenergy SPH50 - Page 3

Clenergy SPH50
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 3 of 26
Clenergy SPH Installation and Operation Manual
Both AC and DC voltage sources are terminated inside this equipment. The
unit must not be opened until both AC and DC circuits have been individually
disconnected for at least 3 hours. (Due to risk of electric shock from energy
stored in capacitors.)
Please take out the unit from the packaging box carefully. Check if there is
any obvious damage. Do not install the unit, if it is damaged. Please contact
your local dealer for a replacement.
The SPH inverter is the latest transformer less design. Please check the
requirements for your country regarding earthing regulations.

Related product manuals