Touch Pad Control
Setup & Commissioning
TEK600 Series Control Page 25
INSTALLATION CHECK LIST
Unit
! All equipment ordered by the customer is installed.
! The unit is level and secure.
! The water supply line has been flushed to clear swarf and debris and is free of leaks.
! The tank is free of foreign matter and debris and the water isolating tap is turned ON.
! Water drainpipe work is completed and sealed.
! The water basin fills with water and the float valve closes correctly when the water level is 65-70mm below the
overflow level.
! The water pump operates correctly when turned ON at the controller.
! The Dialflo water bleed rate is adjusted to suit local water conditions.
! The Superclean Dump Valve (option). The tank drains correctly when unit turns off.
! The fan deck is correctly located and the fan blade spins freely.
! The mains and control wiring are complete and the circuit breaker and GPO are turned ON.
! The fan operates through the entire speed range.
! The minimum fan speed is correctly set.
! Water distribution is even with the filter pads fitted and the air conditioner operating pump and fan.
! All Controller functions for the appliance operate.
! Areas of high water pressure (Exceeding 500Kpa) a water pressure limiting valve must be fitted in accordance
with AS3500. Consequential damage from high water pressure is not covered by warranty.
Ductwork and general
! All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the duct work
diameter.
! Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.
! All roof penetrations are fully sealed and watertight.
! Man hole cover replaced.