EasyManuals Logo

CLIVET WSA-XIN 121 User Manual

CLIVET WSA-XIN 121
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8 WSAT-XIN 21-171 M0Q940G14-03
3 Reception
You have to check before accepting the delivery:
That the unit hasn’t been damaged during transport
That the materials delivered correspond with that indicated on the transport document comparing the data with the identication label
positioned on the packaging.
In case of damage or anomaly:
Write down on the transport document the damage you found and quote this sentence: “Conditional acceptance clear evidence of
deciencies/damages during transport”
Contact by fax and registered mail with advice of receipt to supplier and the carrier.
Any disputes must be made within 8 days from the date of the delivery. Complaints after this period are invalid.
3.1 Storage
Observe external packaging instructions.
3.2 Handling
1. Verify unit weight and handling equipment lifting capacity.
2. Identify critical points during handling (disconnected routes, ights, steps, doors).
3. Suitably protect the unit to prevent damage.
4. Before starting the handling, make sure that the unit is stable.
5. Start hoisting the unit.
6. Remove screws
A - Protections

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CLIVET WSA-XIN 121 and is the answer not in the manual?

CLIVET WSA-XIN 121 Specifications

General IconGeneral
BrandCLIVET
ModelWSA-XIN 121
CategoryChiller
LanguageEnglish

Related product manuals