89
7.8 Decommissioning
Fig. 24
If the system is to be closed down for a
longer period of time (approx. 3 months
or longer) the following preservation
measures must be taken:
* Engine preservation (see separate
engine operating manual).
* Disconnect battery cables.
* No special measures are required at the
compressor.
* Relieve the strain on tyres by jacking up
the vehicle.
* Check tyre pressure every 2 months.
* Release the handbrake.
Attention
When putting back into operation,
carry out the maintenance work
in accordance with Chapter 9
“Maintenance.”
7. Putting the compressor into operation