EasyManua.ls Logo

Confer Plastics ROLLGUARD 7200 - Assembly and Installation Steps; Step 1: Inside Ladder Assembly

Confer Plastics ROLLGUARD 7200
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 1:
INSIDE LADDER
Tools needed: rubber mallet
Parts needed: 1- Inside left rail (marked “IL at the top)
1- Inside right rail (marked “IR” at the top)
4- Ladder treads
#1: Lay “IL rail on flat surface.
#6: Lay “IR” rail on flat surface.
#7: Lift/rotate and align tread tabs
to fit into rail openings..
#9: Do Not Install bottom
tread until Step 4!
#8: Tap all 4 treads down
until seated..
#2: Correct, tap down
until seated, note track is
not blocked..
Incorrect, do not
block track.
#3-5: Install 3 more treads, for a total of 4, see above pictures.

Other manuals for Confer Plastics ROLLGUARD 7200

Related product manuals