EasyManua.ls Logo

Confer Plastics ROLLGUARD 7200 - Step 2: Outside Ladder Assembly

Confer Plastics ROLLGUARD 7200
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 2:
OUTSIDE LADDER
Tools needed: rubber mallet
Parts needed: 1- Outside left rail (marked “OL at the top)
1- Outside right rail (marked “OR” at the top)
5- Ladder treads
#9: Install
bottom tread.
NOTE: Bottom
tread will not
be flush with
ladder leg.
#10: Outside
ladder finished!
#7: Lift/rotate and align tread tabs
to fit into rail openings..
#8: Tap all 4 treads down
until seated..
#2: Correct, tap down
until seated, note track is
not blocked..
#1: Lay “OL rail on flat surface.
#3-5: Install 3 more treads, for a total of 4, see above pictures.
#6: Lay “OR” rail on flat surface.
Incorrect, do not
block track.

Other manuals for Confer Plastics ROLLGUARD 7200

Related product manuals