EasyManua.ls Logo

Conti MC ULTIMA - Page 64

Conti MC ULTIMA
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Edition 05/2021 - MC ULTIMA- Technical documentation - page 64
SACOME, CONFIDENTIAL Document, it is forbidden to duplicate or communicate this document without previous authorization.
Coffee boiler 2 time out alarm
- Time allocated to the coffee
boiler 2 heating exceeded.
- Check the t° probe
- Check the probe connection
- Check the electronic board
- Check the heater and the relay
- Check the programmed heating time
- Check the relay control box
Coffee boiler 3 time out alarm
- Time allocated to the coffee
boiler 3 heating exceeded.
- Check the t° probe
- Check the probe connection
- Check the electronic board
- Check the heater and the relay
- Check the programmed heating time
- Check the relay control box
Flowmeter Grp 1 time out
- No flowmeter 1 pulse after 5
seconds
- Check the flowmeter (flashings)
- Check the flowmeter connection
- Check the electronic board
- Check for clogged coffee group
Flowmeter Grp 2 time out
- No flowmeter 2 pulse after 5
seconds
- Check the flowmeter (flashings)
- Check the flowmeter connection
- Check the electronic board
- Check for clogged coffee group
Flowmeter Grp 3 time out
- No flowmeter 3 pulse after 5
seconds
- Check the flowmeter (flashings)
- Check the flowmeter connection
- Check the electronic board
- Check for clogged coffee group

Related product manuals