EasyManua.ls Logo

Contractor CAB-110P - Page 22

Contractor CAB-110P
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
CONTRACOR
®
Version 3.9
22
Picture 7. Windows
frame removal
Picture 8. Viewing
window replacement
Remove the old window by pulling the window molding. Install the window molding in the
window opening by tting the narrow slit of the molding over the metal edge of the opening.
The molding ends should meet in the middle of the straight section of the opening.
Molding should be compressed so the ends are tightly sealed.
Working from the front, install the view window into the wide slit of the molding.
5.2.5 Window gasket replacement
Replace the window frame gasket and cabinet window opening gasket at the rst sign
of media leakage around the view window, or if gaskets appear damaged.
Check the gaskets when changing the view window. Remove the viewing window and
window frame per Section 5.2.4. Remove all the old gasket material and clean the surfaces
of the cabinet and window frame.
Peel a short section of adhesive backing from the 3x15 mm strip gasket, and adhere
the gasket to the center of the top edge of the window opening as shown in Picture 9. Peel
additional backing as needed, and work the strip around the radius of each comer, pressing
it tightly to bond. Trim the gasket to t and compress the ends to seal.