EasyManua.ls Logo

CORNING CCH-CS - Carton Contents

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTOBER 2017 | PAGE 2 OF 12
2. Carton Contents
2.1 CCH-CS:
(1) Instruction, Splice Cassette for CCH Housings
(2) Track, CCX-04U Housing / Module
(1) Assembly, Back Stacker, CCH-01U, 02U, 03U
(1) Base, Module
(1) Cover, Module
(1) Splice Tray, Module
(1) Splice Holder, Module
(1) Ribbon Tube
(2) Tubing, Heatshrink, 2-in LG (used in Section 5.1, Step 8.)
(1) Adapter, Tube (slit), 1/2-in, OD .300-inch, ID .170-inch
(1) Splice Protector (Heatshrink) (T), IF, 12/pk (60mm)
(4) Cable Tie, 1/8 x 4-in, white
(1) Tubing, Braided, 1/4-in, FR PET, black (used in Section 4.3, Step 10 on right, and
Section 5.2, Step 18)
2.2 CCH-CF
(1) Instruction, Splice Cassette for CCH Housings
(2) Track, CCX-04U Housing / Module
1) Assembly, Back Stacker, CCH-01U, 02U, 03U
(1) Base, Module
(1) Cover, Module
(4) Cable Tie, 1/8 x 4-in, white
(1) Tubing, Braided, 1/4-in, FR PET, black (used in Section 4.3, Step 10 on right, and
Section 5.2, Step 18)