EasyManua.ls Logo

CRL VE­1P - Page 8

CRL VE­1P
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Owner's Manual VE-1P Vertical Edger
Page 7 of 33
SECTION 3 (continued)
3) Check for crushed corners and edges that could indicate the crate was dropped.
4) Check for broken support straps that position the edger and coolant tank on the
mounting skid.
REMOVING THE CRATE
1) Remove top and side of crate. A claw hammer and prybar are suitable tools for this
operation. Remove the protective plastic wrap covering the edger.
2) The edger is securely bolted and strapped to the main mounting skid. Carefully remove
the bolts and strapping.
Small parts and accessories may be found wrapped and placed in the
coolant tank, or boxed and attached to the mounting skid.

Related product manuals