EasyManua.ls Logo

CROWN VERITY MCB - Installation Checklist

CROWN VERITY MCB
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 52 of 64
Installation Checklist
Installer should initial next to each item:
Specified clearances maintained.
Initial assembly completed all tape and internal packaging removed.
Grease/water tray installed.
Burner knobs installed.
Cooking grates installed.
Igniter starts pilot tubes when button is depressed.
Pilot and Burner Tubes light.
Gas pressures have been set in accordance with the rating plate on the grill.
Manual shutoff valve is installed and accessible.
Owner informed of shutoff valve location.
Unit and supply connections have been tested and are free of leaks.
Leave this Manual with the owner.
Installer Signature Date
Please ensure the installer completes the checklist,
explaining each item to you. The
installer should initial each item above
and sign below.

Related product manuals