EasyManua.ls Logo

Crystal Vertical 120 - Hydraulic Connection

Default Icon
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
WARNING: Installation must be carried out by a qualified engineer.
This section is provided for information purposes only and must be checked and adapted if
necessary according to the actual installation conditions.
3.6 Hydraulic connection
By-Pass assembly
The heat pump must be connected to the pool by means of a
By-Pass assembly.
A By-Pass is an assembly consisting of 3 valves that
regulate the flow circulating in the heat pump.
During maintenance operations, the By-Pass permits the heat
pump to be isolated from the system without interrupting your
installation.
Making a hydraulic connection with the By-Pass kit
WARNING: Do not run water through the hydraulic circuit for 2 hours after applying the adhesive.
Step 1: Take the necessary steps to cut your pipes.
Step 2: Make a straight perpendicular cut through the PVC pipes with a saw.
Step 3: Assemble your hydraulic circuit without connecting it in order to check that it perfectly fits your installation,
then dismantle the pipes to be connected.
Step 4: Chamfer the ends of the cut pipes.
Step 5: Apply pipe and connections cleaner to the ends of the pipes and fittings, to be connected so both are
cleaned before gluing.
Step 6: Apply the adhesive in the same place.
Step 7: Assemble the pipe and fittings.
Step 8: Clean off any adhesive remaining on the PVC.
Step 9: Leave to dry for at least 2 hours before putting the hydraulic circuit into water.