EasyManua.ls Logo

CSL Emizon TCD - Page 25

CSL Emizon TCD
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
the ATS as unavailable. The installer needs to verify the performance of the ATS
according table 2 and 3 of the EN50136-1:2012 at commissioning of the ATS and
following any changes (ATE and/ or transmission network)
10 - Logical access at level 4 is defined in EN50136-2:2013.