EasyManua.ls Logo

Curt Manufacturing 18101 - Installation B: Frame Rail Mounting; Mount Bracket Positioning and Securing; Even Spacing of Brackets; Final Plug Insertion

Curt Manufacturing 18101
2 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ATV Cargo Carrier
Operation Manual & Safety Instruction
Model: 18101
Installation B
1. Position the mount brackets (part no. DB-12) so when the bolts are installed they will be on both
sides of a frame rail of the rear flat rack (part no. RF-1) and the ATV rack. Using mount brackets,
M6*75 bolts (part no. DB-13), lock nuts M6 (part no. DB-5), and flat washers M6 (part no. DB-3),
secure the rear flat rack to the ATV rack.
2. Repeat step 1, space the mount brackets out evenly over the surface of the rear flat rack.
3. Insert the plugs (part no. DB-6) into square tubes
PARTS LIST
ITEM Q'TY PART NO. DESCRIPTION ITEM Q'TY PART NO. DESCRIPTION
1 1 RF-1 REAR FLAT RACK 5 16 DB-3 FLAT WASHER M6
2 1 N/A ATV RACK 6 8 DB-5 LOCK NUT M6
3 8 DB-12 MOUNT BRACKET 7 2 DB-6 SQUARE TUBE PLUG
4 8 DB-13 BOLT M6*75