Do you have a question about the CUSHCRAFT 13B2 and is the answer not in the manual?
Instructions for mounting the antenna for vertical polarization for FM use.
Instructions for mounting the antenna for horizontal polarization for CW/SSB use.
Step-by-step instructions for assembling the main boom sections.
Instructions for assembling the T-match assembly and connecting it to the driven element.
Attaching the reflector and director elements to the boom according to specified lengths and positions.
Mounting the antenna boom assembly to the mast using the clamp bracket.
Connecting the coaxial cable and applying protective measures to the connector.
Securing the feedline cable along the boom and mast, including drip loop formation.
Details on using specific kits for stacking two or four antennas, vertically or horizontally.
Ensuring proper phasing by aligning UltraMatches in the same direction for stacked arrays.