EasyManua.ls Logo

Daewoo KOG-36A5 - SAFETY INTERLOCK CONTINUITY TEST; Interlock monitor check procedure; Primary interlock check procedure; Secondary interlock check procedure

Daewoo KOG-36A5
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
¥ Disconnect the oven from the power supply.
¥ You can test continuity of safety interlocks and monitor switch by using switch tester or ohmmeter.
¥ The switch operation is checked by the lamp on/off of resistance zero/unlimited.
¥ The sequence of check is interlock monitor switch; primary and secondary interlock switches check.
¥ Make circuits like Fig. a, Fig. b, Fig. c for tests.
SAFETY INTERLOCK CONTINUITY TEST
1) In case of interlock monitor check.
(Lamp on or zero resistance)
(ohmmeter)
– Fig. a –
Condition: 1) Door is opened.
2) Common terminal of the monitor
switch disconnected.
3) In case of secondary interlock switch.
(Lamp on or zero resistance)
(ohmmeter)
– Fig. c –
Condition : 1) Door is closed.
2) In case of primary interlock check.
(Lamp on or zero resistance)
(ohmmeter)
– Fig. b –
Condition: 1) Door is closed.
ƒN(Schematic diagram of S/W tester)

Related product manuals