EasyManua.ls Logo

Daikin 2MKS40DVMB - Removal of the Electrical Box

Daikin 2MKS40DVMB
230 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit SiBE12-519
190 Removal Procedure
1.3 Removal of the Electrical Box
Procedure Warning Be sure to wait 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure Points
Remove the top panel
and the front panel.
1. Remove the electrical
box.
1
Disconnect the
connection wirings for
each room.
2
Release the outdoor air
thermistor from the
holder.
3
Loosen the four screws
and remove the
electrical box cover.
As for the fan motor lead
wire, refer to the removal
procedure of PCB.

Table of Contents