7 Finishing the outdoor unit installation
Installation manual
29
EBLA04~08E2V3+E23V3 + EDLA04~08E2V3+E23V3
Daikin Altherma 3 M
4P685229-1A – 2022.05
e Wires between the relays and X10M (AWG18 RED)
X5M
5
6 9
10
K2A
K1A
X10M
a
b b
b
1 2
3
4
2 Connect the low voltage wiring as follows:
S4S Smart Grid pulse meter (optional)
3 Connect the high voltage wiring as follows:
X10M. 1
X10M. 2
X10M. 3
X10M. 4
L
L
N
N
1
2
High voltage Smart Grid contact 1
High voltage Smart Grid contact 2
4 Fix the cables with cable ties to the cable tie mountings. If
necessary, bundle excessive cable length with a cable tie.
7 Finishing the outdoor unit
installation
7.1 To check the insulation resistance
of the compressor
NOTICE
If, after installation, refrigerant accumulates in the
compressor, the insulation resistance over the poles can
drop, but if it is at least 1MΩ, then the unit will not break
down.
▪ Use a 500V mega-tester when measuring insulation.
▪ Do NOT use a mega-tester for low voltage circuits.
1 Measure the insulation resistance over the poles.
If Then
≥1MΩ Insulation resistance is OK. This procedure
is finished.
<1MΩ Insulation resistance is not OK. Go to the
next step.
2 Turn ON the power and leave it on for 6hours.
Result: The compressor will heat up and evaporate any
refrigerant in the compressor.
3 Measure the insulation resistance again.
8 Configuration
INFORMATION
Cooling is only applicable in case of reversible models.
8.1 Overview: Configuration
This chapter describes what you have to do and know to configure
the system after it is installed.
NOTICE
This chapter explains only the basic configuration. For
more detailed explanation and background information,
see the installer reference guide.