Smart Grid contact Smart Grid operation mode
1
2
0 1 Forced off
1 0 Recommended on
1 1 Forced on
The use of a Smart Grid pulse meter is not mandatory:
If Smart Grid pulse meter is… Then [9.8.8] Limit setting kW
is…
Used
([9.A.2] Electricity meter 2
None)
Not applicable
Not used
([9.A.2] Electricity meter 2 =
None)
Applicable
In case of low voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5mm²
Wires (low voltage Smart Grid contacts): 0.5mm²
[9.8.4]=3 (Benefit kWh power supply = Smart grid)
[9.8.5] Smart grid operation mode
[9.8.6] Allow electrical heaters
[9.8.7] Enable room buffering
[9.8.8] Limit setting kW
The wiring of the Smart Grid in case of low voltage contacts is as
follows:
1413
S11S
65
S4S
43
X5M
S10S
109
a
2 1
a Jumper (factory-mounted). If you also connect a safety
thermostat (Q4L), replace the jumper with the safety
thermostat wires.
S4S Smart Grid pulse meter
1
/S10S
Low voltage Smart Grid contact 1
2
/S11S
Low voltage Smart Grid contact 2
1 Connect the wiring as follows:
B
C
A
A
X5M.4
X5M.3
S4S
X5M.10
X5M.9
S10S
X5M.6
X5M.5
S11S
2
1
CB
X5M
X5M
34569
101314
2 Fix the cables with cable ties to the cable tie mountings.
In case of high voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5mm²
Wires (high voltage Smart Grid contacts): 1mm²
[9.8.4]=3 (Benefit kWh power supply = Smart grid)
[9.8.5] Smart grid operation mode
[9.8.6] Allow electrical heaters
[9.8.7] Enable room buffering
[9.8.8] Limit setting kW
The wiring of the Smart Grid in case of high voltage contacts is as
follows:
S4S
34
X5MX5M
1314
K2AK1A
56910
K1ALNL
N
STEP 3
a b c d e f
STEP 1 STEP 2
A1
A2
4321X10M
K2A
A1
A2
2 1
STEP 1 Smart Grid relay kit installation
STEP 2 Low voltage connections
STEP 3 High voltage connections
1
High voltage Smart Grid contact 1
2
High voltage Smart Grid contact 2
a, b Coil sides of relays
c, d Contact sides of relays
e Jumper (factory-mounted). If you also connect a safety
thermostat (Q4L), replace the jumper with the safety
thermostat wires.
f Smart Grid pulse meter
1 Install the components of the Smart Grid relay kit as follows:
a
b
c
d
e
K1A K2A
X10M
×2
×4
K1A, K2A Relays
X10M Terminal block
a Screws for X10M
b Screws for K1A and K2A
c Sticker to put on the high voltage wires
All manuals and user guides at all-guides.com

Table of Contents

Other manuals for Daikin Altherma EBBH11DF6V

Related product manuals