4 Unit installation
Installation manual
6
ERRA08~12E
Daikin Altherma 3 R MT
4P708481-1 – 2023.02
4.2 Mounting the outdoor unit
4.2.1 To provide the installation structure
NOTICE
Level. Make sure the unit is leveled in all directions.
Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least
150 mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100 mm above the maximum expected
level of snow.
Anchor points
Pedestal
When installing on a pedestal, make sure that the discharge grille
still can be put in its safety position. See "7.4 To remove the
discharge grille, and put the grille in safety position"[414].
a Make sure not to cover the drain hole in the bottom plate
of the unit.
4.2.2 To install the outdoor unit
CAUTION
To avoid injury, do NOT touch the air inlet or aluminium
fins of the unit.
1 Carry the unit by its slings, and put it onto the installation
structure.
2 Fix the unit to the installation structure.
3 Remove the slings (and screws), and dispose of them.
4.2.3 To provide drainage
Make sure that condensation water can be evacuated properly.