EasyManua.ls Logo

Daikin ALTHERMA HT ERSQ 011 AA - Page 91

Daikin ALTHERMA HT ERSQ 011 AA
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE09-08A Test Operation
Test Operation 79
1.1.2 Turn Power On
Turn outdoor unit power on .
Turn indoor unit power on .
(V3056)
Be sure to turn the power on 6 hours before starting operation to
protect compressors.
Close outside panels of the outdoor unit.
Wait until initialization period is over (up to 12 min).
(Can be known by checking leds on outdoor PCB - see “Field
Settings from Outdoor unit” for details.
Car ry out the test run as
desc ribed in the installation
manual of the indoor unit
Carry out field setting, if
necessary

Table of Contents

Related product manuals