EasyManua.ls Logo

Daikin AMST42CU14 User Manual

Daikin AMST42CU14
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
AMST***U1400**
AIR HANDLERS INSTALLATION &
OPERATING INSTRUCTIONS
© 2021-2023 Daikin Comfort Technologies Manufacturing, L.P.
19001 Kermier Rd., Waller, TX 77484
www.goodmanmfg.com -or- www.amana-hac.com
P/N: IO-4004C Date: April 2023
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
NOTE: SPECIFICATIONS AND PERFORMANCE DATA LISTED HEREIN
ARE SUBJECT TO CHANGE WITHOUT NOTICE
Contents
1 Important Safety Instructions .................................... 2
2 Shipping Inspection ................................................... 3
2.1 Parts ....................................................................... 3
2.2 Handling ................................................................. 3
2.3 Shipping Material Removal..................................... 3
2.3.1 Blower Support Bracket Removal ....................... 3
3 Codes & Regulations ................................................. 3
4 Replacement Parts ..................................................... 4
5 Pre-Installation Considerations ............................... 4
5.1 Preparation ............................................................. 4
5.2 System Matches ..................................................... 4
5.3 Interconnecting Tubing ........................................... 4
5.4 Clearances ............................................................. 4
5.5 Horizontal Applications ........................................... 4
5.6 Access .................................................................... 4
6 Installation Location ................................................... 4
 .................................................. 4
6.2 Horizontal Left Installation ...................................... 5
 5
6.4 Humid Environment Installations ............................ 6
6.4.1 All Installations – Humid Environments ............... 6
 6
6.4.1.3 Horizontal Installations – Humid Environments 6
7 Refrigerant Lines ........................................................ 7
7.1 Tubing Size ............................................................. 7
7.2 Tubing Preparation ................................................. 7
7.3 Tubing Connections ................................................ 7
7.4 Thermal Expansion Valve System Adjustment ....... 9
8 Condensate Drain Lines ........................................... 10
9 Ductwork .................................................................... 11
9.1 Return Ductwork .................................................... 11
10 Return Air Filters ..................................................... 11
11 Electric Heat ............................................................. 11
12 Electrical and Control Wiring ................................. 12
12.1 Building Electrical Service Inspection .................. 12
12.2 Wire Sizing .......................................................... 12
12.3 Maximum Overcurrent Protection (MOP) ............ 12
12.4 Electrical Connections – Supply Voltage ............. 13
12.4.1 Air Handler Only (Non-Heat Kit Models) ........... 13
12.4.2 Air Handler - Non-Circuit Breaker Heat Kits ..... 13

























WARNING
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION

WARNING
Question and Answer IconNeed help?

Do you have a question about the Daikin AMST42CU14 and is the answer not in the manual?

Daikin AMST42CU14 Specifications

General IconGeneral
BrandDaikin
ModelAMST42CU14
CategoryAir Handlers
LanguageEnglish

Summary

1 Important Safety Instructions

5 Pre-Installation Considerations

5.1 Preparation

Carefully read all instructions and assemble needed tools before starting installation.

5.2 System Matches

Ensure the entire system is manufacturer approved and AHRI listed.

5.3 Interconnecting Tubing

Minimize refrigerant tubing length and allow for coil removal.

5.4 Clearances

Maintain minimum service clearance and consider wet/damage prone areas.

5.5 Horizontal Applications

Install a secondary drain pan for units above finished living space.

6 Installation Location

6.2 Horizontal Left Installation

Install unit as shown in Figure 5 for horizontal left orientation.

7 Refrigerant Lines

7.4 Thermal Expansion Valve System Adjustment

Procedures for checking and adjusting TXV for proper superheat and subcooling.

8 Condensate Drain Lines

9 Ductwork

11 Electric Heat

12 Electrical and Control Wiring

12.4 Electrical Connections – Supply Voltage

Connect supply voltage conductors using appropriate knockouts and copper wire.

12.5 Low Voltage Connections

Connect 24V-control voltage to thermostat and condenser using copper conductors.

12.6 Speed Tap Adjustment

Adjust blower motor speed by changing 24 VAC leads to desired speed tap.

14 Start-Up Procedure

15 Regular Maintenance

17 Air Handler Low Voltage Connections

18 Wiring Diagrams

19 Start-Up Checklist

Related product manuals