EasyManuals Logo
Home>Daikin>Air conditioning>CDKD35CVM

Daikin CDKD35CVM User Manual

Daikin CDKD35CVM
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #246 background imageLoading...
Page #246 background image
Si12-411A Outdoor Unit (80 / 90 Class)
Removal Procedure 235
1.7 Removal of Sound Insulation and Reactor
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1
Release the clip fixing
the compressor lead
wire.
2
Remove 2 screws of
the partition board, and
move the board
leftward.
The partition board is not
removable as it is fixed with
the fitting screw in the rear
bottom.
3
Remove the noise
insulation (outer).
Carefully remove the noise
insulation, which is easily
torn in the piping section.

Table of Contents

Other manuals for Daikin CDKD35CVM

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin CDKD35CVM and is the answer not in the manual?

Daikin CDKD35CVM Specifications

General IconGeneral
BrandDaikin
ModelCDKD35CVM
CategoryAir conditioning
LanguageEnglish

Related product manuals